Friday, May 17, 2013

Week 8 and 9 Wrap-up

At the end of week 8 we scheduled a walk-through with our project manager. The drywall was up and the first coat of paint was on the walls.  We were shocked by how dark the flooring in the second floor baths looks.  We didn't remember our choice being so dark but it was what we choose.


At the end of week 9 the cabinets and trim were installed and the driveway was paved.